Case Study:
Yiu Ming Temple, Alexandria

Concrete Awning Demolition &  Façade Remediation

The Challenge

Wardell Remedial was engaged by the Owners Corporation of Strata Plan SP64282, through Strata Title Management, to undertake concrete awning demolition and façade remediation works at 240 Wyndham Street, Alexandria. The Level 5 concrete awning overhung the courtyard of the heritage-listed Yiu Ming Temple, adding significant complexity to works carried out above an active place of worship.

The works followed a Lindsay & Associates Regulated Design Report identifying concrete spalling, cracked render, and a failed waterproof membrane to the Level 5 awning slab. The scope included demolition of the 25-lineal-metre concrete awning, concrete repairs, new acrylic render and Dulux coatings, a waterproof membrane system, new concrete hob and Colorbond capping, and full B-type gantry hoarding and modular scaffolding to the north elevation, all delivered within a 16-week programme.

The Solution

Wardell Remedial managed the works under a single lump sum contract, coordinating all engineering, permitting, access, and construction phases. Prior to mobilisation, the team obtained Council permits, submitted scaffold designs and engineering certifications, and uploaded regulated design documentation to the NSW Planning Portal.

A B-type gantry hoarding and modular scaffolding system were installed to protect pedestrians and the Yiu Ming Temple courtyard, with safety mesh and catch decks used to safely contain demolition debris. Structural reinstatement works included a new Ardex waterproofing system, concrete hob, Colorbond capping, and concrete plinths to the balustrade base plates.

Key Metrics

PROJECT VALUE

$375K

PROGRAMME

16 Weeks

YEAR COMPLETED

2026

Why Wardell Remedial

Concrete awning demolition above a sensitive community site, with full gantry hoarding, scaffolding, council permits, engineering and planning portal compliance managed under a single contract, is exactly the kind of complex, multi-discipline remediation project that requires an experienced head contractor — not a series of separate trade engagements.

Wardell Remedial brings the project management capability, engineering relationships and trade expertise to deliver high-risk demolition and remediation works within strata environments, on time and without impact to neighbouring properties or users. Our full in-house management of the council and Ausgrid permitting process at 240 Wyndham Street reflects the end-to-end accountability we provide on every project.

Previous
Previous

USYD Molecular BioScience Building

Next
Next

52–54 McEvoy St, Waterloo